Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Abstract
In recent years, a few studies have been working on the optimization of 3D reinforced concrete structures. The number of research on this subject is increasing day by day. However, in these studies, the real world-structure is generally not used; moreover, only regular structures are used, and RC shear walls do not continue on all floors. Therefore, 3D evaluation of the optimization of real-world RC structures is possible for a small number of building types. There is a need for 3D optimization studies that can be used for all building types. In this study, 3D optimization of a real-world reinforced concrete structure is carried out. The sample structure used in the paper is not only a regular reinforced concrete-framed structure, unlike other studies, but also a RC framed structure with RC shear walls continuing on each floor. In the numerical example, the effect of the RC shear walls continuing on each floor is applied in the analysis, and the design processes of the construction projects on a real-world building and the quantity-cost analysis are made together. All optimization processes are directed automatically using the ACDOS programming, which is developed by the authors. ACDOS can take into account the commercial program named Etabs to make design of construction and the metaheuristic algorithms to reduce the total cost of construction. The results obtained from this study showed that the cost (concrete-rebar-formwork) of the 7-story public dormitory building was reduced by 9.18% when compared with its real-world application.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Architecture; Construction cost; optimization; Jaya; metaheuristic algorithms; Construction industry; Concrete; Cost analysis; Reinforced concrete; Formwork; Construction; Algorithms; Floors; Concrete structures; Construction costs; Frame structures; Public buildings; Shear walls; Project engineering; Heuristic methods |
| Index terms: | dormitory, rebar, reinforced concrete, programming, project engineering, construction project, program, concrete structure, public building, construction industry, heuristic, design process, cost analysis, frame structure, formwork, construction cost |
| Subjects: | software systems, structural engineering, production management, building construction, industry analysis, risk assessment, construction type, design methods, control systems, programming, building materials, financial and cost management |
| Topics: | Digital Applications, Design Practice, Cost Management, Construction Materials, Engineering Principles, Project Management, Research Practice, Risk Management, Construction Technology |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here