An integrated system for duration estimation in design/build projects and organizations

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988

Abstract

Overruns to planned schedules are common in civil construction projects worldwide. Yet, the construction industry fails to recognize the criticality of the problem, and while models have been developed, their lack of adequate sophistication fails to alleviate the problem. Additionally, there is resistance from construction professionals to use such models due to the lack of software integration models and modular functionality. This paper presents a performance-based duration estimation model integrated with an automation system model, MITOS - multi-phase integrated automation system, that was designed primarily for design/build firms. An experience-based computational model is used for the estimation of the duration of construction projects and the performance results are discussed.

Item Type: Article
Uncontrolled Keywords: architecture; construction industry; design and development; information systems; organizations; time-based management
Index terms: overrun, functionality, computational model, performance-based, information system, construction project, integration, estimation, design and development, integrated system, automation, construction industry, duration, construction professional
Subjects: design methods, modelling and simulation, design features, financial and cost management, performance measurement, production management, automation and robotics, professional development, design process, organizational analysis, project controls, industry analysis, information systems
Topics: Time Control, Organizational Design, Quality Management, Digital Applications, Design Practice, Information Management, Research Practice, Project Management, Cost Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here