Impact of construction materials on project time and cost in Kuwait

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988

Abstract

The construction of residential projects constitutes a major portion of the building activities in the State of Kuwait. This paper presents the findings of a research project, which aims to determine the causes of delays and cost-overruns in the construction of housing projects in Kuwait. The owners of 450 residential projects (just completed or near completion), spread over 27 systematic-randomly selected metropolitan districts, were personally interviewed. Data on owners' socio-demographic traits and project characteristics, including those involving time and cost overruns, were obtained. The paper highlights the impacts of construction materials on time-delays and cost-increases. Project-related variables affecting the on-time delivery of materials to the construction site are examined and quantified. The material selection-time, type of materials, their availability in the local market and the presence of a supervising engineer, all demonstrated a statistically significant impact on the on-time delivery of materials to construction sites.

Item Type: Article
Uncontrolled Keywords: construction industry; costs; housing; real time scheduling
Index terms: construction industry, causes of delay, presence, construction material, real time, cost overrun, engineer, owner, housing, Kuwait, residential project, housing project, overrun, construction site, scheduling
Subjects: industry analysis, sociology, project controls, housing and residential development, Geography, economic development, financial and cost management, environmental science, operations research, building materials, work location, construction type, profession
Topics: Urban Studies, Time Control, Site Management, Engineering Principles, Research Practice, Geographical Context, Cost Management, Sustainability, Construction Technology, Stakeholder Management, Roles and Professions
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here