Current practices in building project contract price forecasting in the UK

Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988

Abstract

Purpose - The selection and use of the most appropriate building project contract price forecasting model contribute to the provision of strategic advice that clients can use to make value-for-money business decisions. This work seeks to provide a snapshot of current practice in model selection by practitioners based in large-sized quantity surveying, project management and multi-disciplinary practices based in the UK. Design/methodology/approach - A quantitative research design was used to capture data from a sample of 300 such organisations in 2004. An initial and follow-up administration of the postal survey generated an overall response of 54 per cent. Findings - The findings of the study revealed that the traditional types of forecasting model continue to be in widespread use irrespective of organisational type. Lifecycle cost models and in-house knowledge-based systems were also found to be in use, but not on such a widespread scale. Newly developed models such as artificial neural nets, fuzzy logic nets, as well as environmental and sustainability cost models were found, as yet, to have only very limited application in practice. Practitioner assessment of model accuracy and value in-use provided statistically insignificant levels of variance between the organisational types and the models found to be in use. Research limitations/implications - The work is limited due to the size of the sample frame and the measuring instrument used which could not uncover reasons for the selection of particular types of models. Originality/value - The outcomes of the work provide benchmarks that can be used to evaluate organisational approach and future research. The paper contributes to the body of knowledge available on the process of building project contract price forecasting that is fundamental to the assessment of project value.

Item Type: Article
Uncontrolled Keywords: economic theory; management activities; measurement characteristics; pricing
Index terms: surveying, model accuracy, survey, measuring instrument, cost model, practitioner, methodology, value-for-money, body of knowledge, fuzzy logic, neural net, forecasting, quantitative research, pricing, variance, economic theory, knowledge-based system, lifecycle, price forecasting model, project management
Subjects: data collection methods, practitioner, economic analysis, prediction and forecasting, health monitoring assessment and metrics, financial and cost management, project delivery, analytical methods, data analysis and analytics, knowledge management, artificial intelligence, data science, research methods, project management theory and practice, evaluation, measurement and scaling
Topics: Roles and Professions, Business Strategy, Cost Management, Health and Safety, Project Management, Research Practice, Information Management, Engineering Principles, Digital Applications, Value Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here