A building cost estimation model based on cost significant work packages

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988

Abstract

Purpose - The objectives of this paper are to discuss the constraints stemming from the unstructured nature of the cost estimation practice in Turkey and introduce a generic computer aided building cost estimation model based on a cost significant technique for Turkish construction sector public projects in its detailed design phase. Design/methodology/approach - The research design was based on the simplified version of the bill of quantities method and a cost significant estimating model works on a cost database was suggested to overcome the problems. Underlying principles and basic steps of cost estimation based on cost significant work packages was explained by means of manual calculations. Findings - In order to automate the manual building cost estimation process, the software based on cost significant work packages was developed. Research limitations/implications - The software is currently in the testing phase and is being used for educational purposes. Making use of both public sector and current market prices in the cost estimation process, increasing number of projects stored in the database for more accurate results, estimating costs of different types of projects and calculating the cost significant value factor more precisely by using statistical techniques, those being employed by global cost models are suggested for future research. Practical implications - As the number of the similar projects in database is increased, the accuracy of the cost estimation is also increased. Originality/value - Estimators and graduate students can use the software to estimate building cost of public housing projects in its detailed design phase.

Item Type: Article
Uncontrolled Keywords: computer applications; construction industry; cost allocation; cost estimates; Turkey
Index terms: cost estimating, accuracy, public project, methodology, estimator, cost model, construction sector, graduate student, estimating, Turkey, package, computer application, research design, public sector, database, public housing, design phase, estimate, bills of quantities, testing, cost estimate, construction industry
Subjects: data management, industry analysis, administrative law, software systems, research methods, infrastructure engineering, professional development, Geography, curriculum design, financial and cost management, contractual arrangements, professional practice, research design and methodology, construction type, profession
Topics: Procurement, Construction Technology, Roles and Professions, Engineering Principles, Information Management, Research Practice, Geographical Context, Cost Management, Education, Digital Applications, Legal Issues, Design Practice
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here