Bidding ratios to predict highway project costs

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Abstract

Purpose - Ratios were constructed using bidding data for highway construction projects in Texas to study whether there are useful patterns in project bids that are indicators of the project completion cost. The use of the ratios to improve predictions of completed project cost was sdtudied. Design/methodology/approach - Ratios were calculated relating the second lowest bid, mean bid, and maximum bid to the low bid for the highway construction projects. Regression and neural network models were developed to predict the completed cost of the highway projects using bidding data. Models including the bidding ratios, low bid, second lowest bid, mean bid and maximum bid were developed. Natural log transformations were applied to the data to improve model performance. Findings - Analysis of the bidding ratios indicates some relationship between high values of the bidding ratios and final project costs that deviate significantly from the low bid amount. Addition of the ratios to neural network and regression models to predict the completed project cost were not found to enhance the predictions. The best performing regression model used only the low bid as s input The best performing neural network model used the low bid and second lowest bid as inputs. Originality/value - The nature of bid ratios that can describe the pattern of bids submitted for a project and the relationship of the ratios to project outcomes were studied. The ratio values may be useful indicators of project outcome that can be used by construction managers.

Item Type: Article
Uncontrolled Keywords: construction industry; costs; neural nets; regression analysis; roads
Index terms: bidding, construction manager, methodology, project cost, neural network, high-value, regression analysis, construction industry, highway construction, transformation, project outcome, neural net, regression model
Subjects: research methods, civil engineering, economics, industry analysis, statistical analysis, profession, business, project completion, bidding, artificial intelligence, economic analysis
Topics: Digital Applications, Research Practice, Project Management, Engineering Principles, Cost Management, Business Strategy, Procurement, Roles and Professions
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here