Conflicting factors in construction projects: Korean perspective

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Abstract

Purpose – The purpose of this article is to identify and explore pertinent conflicting factors in construction projects; which would be helpful for project planners and implementers in assessing and taking proactive measures for reducing the adverse effect of conflict. Design/methodology/approach – To achieve the study objectives, a 43-item questionnaire survey in a five-point Likert scale was carried out to collect professionals' experience on conflicting activities in Korean construction projects. Responses from 124 professionals working for owners, consultants and contractors were analyzed. Furthermore, ten face-to face interviews were also carried out to ratify the findings from the field survey. Later, analytical hierarchical process method was employed to find out the importance weighting as well as responsible party for the perceived conflicts. Findings – This study has found out six critical construction conflicting factors pertinent in Korean context. These factors with importance weighting are: differing site condition (24.1 percent), public interruption (22.5 percent), differences in change order evaluation (21 percent), design errors (17.1 percent), excessive contract quantities variation (8.2) and double meaning of specifications (7.1 percent). The study has revealed that owner (35.6 percent) and consultant (34.18 percent) are mostly responsible parties for conflicts in construction projects. Originality/value – As the previous researches have been indicating increase in conflicts in construction field, this paper is very topical at the moment. This work has tried to explore the underlying problems of the construction field. The study provides field level experiences from which the inexperience construction site professionals could learn the instances of conflicts and not repeat the mistakes in their projects.

Item Type: Article
Uncontrolled Keywords: conflict; conflict management; construction operations; South Korea
Index terms: construction project, variation, methodology, questionnaire, Likert scale, conflict management, interview, specification, construction site, face, meaning, survey, planner, design error, South Korea, owner, change order, construction operation
Subjects: data collection methods, profession, work location, psychology, professional practice, construction operations, research methods, production management, Geography, contractual condition, sociology, conflict resolution
Topics: Geographical Context, Project Management, Research Practice, Roles and Professions, Stakeholder Management, Design Practice, Site Management, Organizational Design, Contract Administration
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here