Factors influencing the construction time of civil engineering projects in Malaysia

Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988

Abstract

Purpose - The objectives of this paper are to determine the current level of construction time performance of public sector projects; and to identify variables related to project characteristics and variables associated with excusable delay that have significant effects on the construction time performance of public sector civil engineering projects in Malaysia. Design/methodology/approach - This study adopted a quantitative approach. Original contract duration and actual contract duration of 244 projects were collected from project files to assess current level of CTP. Variables related to project characteristics and excusable delays were then regressed against time performance index using multiple regression analysis to identify variables that had significant relationships with construction time performance. Findings - The construction time performance of the public projects in Malaysia was found to be affected more by variables related to excusable delays than project characteristic variables. Research limitations/implications - This study is focused on public sector civil engineering projects limited to irrigation and drainage, road and sewerage projects where building was not included. Practical implications - Excusable delays were found to be common causes of delay in significant numbers of public projects. Originality/value - The variables that were found to be significant should be given attention by planners and designers in order to minimize the occurrence of delay in public projects.

Item Type: Article
Uncontrolled Keywords: construction industry; Malaysia; production downtime; production planning; public finance
Index terms: methodology, time performance, public project, drainage, multiple regression analysis, production planning, causes of delay, planner, duration, construction industry, construction time, Malaysia, designer, excusable delay, public sector
Subjects: infrastructure and transport systems, industry analysis, administrative law, statistical analysis, project controls, Geography, infrastructure engineering, research methods, project delivery, profession
Topics: Time Control, Legal Issues, Roles and Professions, Research Practice, Geographical Context, Project Management, Engineering Principles
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here