Prasertrungruang, T and Hadikusumo, B H W (2007) Heavy equipment management practices and problems in Thai highway contractors. Engineering, Construction and Architectural Management, 14(3), pp. 228-241. ISSN 0969-9988
Abstract
Purpose - This study is intended to investigate the current practices and problems in heavy equipment management as well as to identify practices capable of alleviating equipment management problems for highway contractors in Thailand. Design/methodology/approach - Equipment management practices were identified and analysed by SPSS using a questionnaire survey. ANOVA test was used to reveal significant differences in equipment management practices among different contractor sizes. Relationships between equipment management practices and problems were also revealed. Findings - The equipment management practices vary, to some extent, among different contractor sizes. While practices of medium and small contractors tend to be similar, practices of large contractors are different from those of smaller contractors. Large contractors often put more emphasis on outsourcing strategy for equipment management. Moreover, large contractors frequently dispose of or replace equipment as soon as the equipment becomes inefficient before incurring high repair costs. Conversely, smaller contractors tend to mainly emphasise on the company finance and the budget availability as they often rely on purchasing strategy, especially buying used machines. Overall, equipment practices of large contractors were found to be more successful than smaller contractors in minimising equipment management problems, including long downtime duration and cost. Originality/value - This research is of value for better understanding practices and problems relating to heavy equipment management among different contractor sizes. The study also highlights practices that are capable of reducing problems relating to heavy equipment management for highway contractors.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction equipment; construction industry; Thailand |
| Index terms: | repair, methodology, questionnaire, strategy, equipment management, survey, construction industry, duration, Thailand, purchasing, outsourcing, construction equipment |
| Subjects: | construction equipment, Geography, maintenance engineering, research methods, management, procurement strategy, industry analysis, project controls, business, data collection methods, operational management |
| Topics: | Time Control, Plant and Equipment, Procurement, Business Strategy, Geographical Context, Research Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here