Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Abstract
Purpose - The purpose of this paper is to investigate attitudes and opinions of quantity surveyors working for design and construction contractors regarding the importance and use of life cycle costing within private finance initiative (PFI) projects, and the subsequent effects on the maintenance budgets of the facilities management contractor within the PFI consortium. Design/methodology/approach - This research includes a literature review, a questionnaire survey, four semi-structured interviews and a case study of a facilities management contractor that operated on a completed PFI project. Findings - The research identified that contractors' quantity surveyors generally did consider life cycle costs when procuring new products/elements for PFI projects, but in certain circumstances, such as during exceptionally busy times or when working within tight construction budgets, life cycle costs were not considered and procurement decisions for some products/elements were made on the basis of lowest capital cost. The research found that the occasional failure of contractors' quantity surveyors to consider life cycle costs had significant financial risk implications for the facilities management contractors, as there were likely to be increased maintenance costs in the future, compared to the original budget for maintenance costs. Originality/value - This research will be of interest to industry professionals working on PFI projects, particularly quantity surveyors and facilities management contractors. Academic researchers with an interest in life cycle costing will benefit from the information on the practicalities of managing costs on a PFI project.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction industry; life cycle costs; maintenance costs; private finance; United Kingdom |
| Index terms: | consortium, quantity surveying, case study, life cycle, construction budget, private finance, design and construction, procurement decision, construction industry, costing, maintenance cost, interview, capital cost, United Kingdom, literature review, survey, life cycle cost, private finance initiative, methodology, questionnaire, facilities management |
| Subjects: | data collection methods, profession, value management, contractual arrangements, data analysis and analytics, financial and cost management, management, financial management, research methods, accounting and finance, Geography, partnership management, procurement strategy, industry analysis |
| Topics: | Cost Management, Business Strategy, Geographical Context, Project Management, Research Practice, Stakeholder Management, Roles and Professions, Procurement |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here