Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988
Abstract
Purpose Despite its benefits, the uptake of 4D planning in the construction industry is slow and therefore there is a need to demonstrate its value over traditional planning technologies. The aim of this paper is to develop a novel approach that demonstrates the value of 4D tools to the construction industry. Design/methodology/approach The research strategy utilised draws on several social science research methods. The data collection methods employed included a literature review, an open-ended questionnaire, surveys, semi-structured interviews and the analysis of historical site records. The data collected were analysed using qualitative and quantitative techniques in order to identify, develop and quantify 4D-based key performance indicators. Findings This paper identifies and quantifies 4D-based key performance indicators using case study analysis. In the case studies it was found that, on average, a 17 per cent increase in planning efficiency were achieved by the use of 4D technology, while the communication efficiency measure illustrated that, on average, a 30 per cent reduction in the time used for meetings was achieved by the use of 4D planning. Practical implications The complexity and rapid pace of development in today's construction projects are challenging the industry to find new innovative approaches to delivering projects. 4D tools are emerging as a construction planning technology that addresses some of these challenges. 4D planning has the potential to improve the visualisation of building design and construction, but its implementation in the industry has yet to reach maturity. Originality/value The paper highlights technology that enables clients, contractors, planners and sub-contractors to visualise and understand design and scheduling issues at the early stages of a project.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | communication; construction industry; construction operations; forward scheduling; performance management |
| Index terms: | scheduling, 4D planning, performance indicator, interview, survey, literature review, strategy, questionnaire, sub-contractor, methodology, construction project, complexity, visualization, case study, key performance indicator, efficiency, performance management, building design, construction operation, planner, social science, construction planning, construction industry, implementation |
| Subjects: | visualization, operations research, construction operations, data analysis and analytics, contractual arrangements, project delivery, construction planning, architectural design, data collection methods, profession, practitioner, industry analysis, systems engineering, management, theoretical framing, design practice, performance measurement, research methods, performance management, production management |
| Topics: | Time Control, Site Management, Digital Applications, Design Practice, Quality Management, Roles and Professions, Procurement, Business Strategy, Engineering Principles, Research Practice, Project Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here