Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988
Abstract
Purpose – The purpose of this paper is to compare the predictive capability of three methods of truck cycle time estimation in openpit mining: computer simulation, artificial neural networks (NNs), and multiple regressions (MRs). The aim is to determine the best method. The most common method currently used is computer simulation. Design/methodology/approach – Truck cycle times at a large open pit mine are estimated using computer simulation, artificial NNs, and MRs. The estimated cycle times by each method are in turn compared to the actual cycle times recorded by a computerized mine monitoring system at the same mine. The errors associated with each method relative to the actual cycle times are documented and form the basis for comparing the three methods. Findings – The paper clearly indicates that computer simulation methods used in predicting truck cycle times in openpit mining underestimate and overestimate the results for short and long hauls, respectively. It appears that both NN and regression models are superior in their predictive abilities compared to computer simulations. Research limitations/implications – The cycle time prediction models developed apply to a specific mine site and one has to be careful not to directly apply these models to other operations. Practical implications – The paper describes the implementation of regression and NN modelling. An opportunity exists for mines to utilise the large volumes of data generated to predict truck haulage cycle times more accurately and hence, improve the quality of mine planning. Originality/value – The paper addresses an area of need in the mining industry. Accurate prediction of cycle times is critical to mine planners as it impacts on production targets and hence, the budgets.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | multiple regression analysis; neural nets; production cycle; simulation |
| Index terms: | planner, methodology, mining, comparative study, time prediction, multiple-regression, modelling, time estimation, regression model, multiple regression analysis, artificial neural network, computer simulation, neural net, monitoring, implementation |
| Subjects: | research design and methodology, geotechnical engineering, contractual arrangements, control systems, statistical analysis, profession, operations research, modelling and simulation, analytical methods, research methods, artificial intelligence |
| Topics: | Digital Applications, Research Practice, Roles and Professions, Site Management, Time Control, Engineering Principles, Procurement |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here