Health and safety gateways for construction project planning

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(2), pp. 192-204. ISSN 0969-9988

Abstract

Purpose - This paper aims to report on the findings from a research project, commissioned by the UK Health and Safety Executive (HSE), investigating the integration of health and safety (Hamp;S) with construction planning. Design/methodology/approach - A combination of group and individual interviews were undertaken with qualitative methods of analysis to develop an integrated process model. Findings - The model developed uses "Gateway" decision points, which allows flexibility and the early integration of Hamp;S at a strategic level, although detailed planning is still required through the use of integrated management tools. Practical implications - This study will help practitioners who wish to integrate CDM principles using a process model. It has also informed the HSE with policy decisions for their review of the Construction Design and Management Regulations 1994. Originality/value - Previous research on construction Hamp;S has tended to concentrate on site management. This study extends knowledge and understanding of how Hamp;S can be integrated at the planning stage of projects.

Item Type: Article
Uncontrolled Keywords: construction industry; gateway; health and safety; integration; pre-construction planning; United Kingdom
Index terms: health and safety executive, pre-construction, construction planning, construction industry, site management, qualitative method, United Kingdom, health and safety, interview, practitioner, regulation, construction project, integration, methodology
Subjects: research methods, health safety and environment, Geography, production management, organizational analysis, industry analysis, political science, data collection methods, research design and methodology, practitioner, construction operations, construction planning, project delivery
Topics: Health and Safety, Project Management, Geographical Context, Research Practice, Roles and Professions, Governance, Site Management, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here