Users' satisfaction survey on building maintenance in public housing

Lai, A W Y and Lai, W M (2013) Users' satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(4), pp. 420-440. ISSN 0969-9988

Abstract

Purpose - A building maintenance scheme introduced by the Hong Kong Housing Authority in January 2006 employed contractors and public housing owner's frontline representatives to provide inspection in the public rental housing tenants' units and arrange corresponding repair works. This study aims to base on the public rental housing (PRH) tenants' perceptions to measure maintenance contractor service quality performance. Design/methodology/approach - Questionnaire is used as the assessment tool which is derived based on the SERVQUAL approach to measure public rental housing tenants' expectations and perceptions on maintenance contractor performance. Findings - The findings illustrate that dimensions of "tangible" and "reliability" have the largest discrepancy between expectation level and perception level. They are mainly related to the concern of disturbance to PRH tenants brought by maintenance contractors in respect of manpower arrangement. These findings support that there is a need for maintenance contractors to impose more manpower resources to minimize the adverse impacts to PRH tenants. Research limitations/implications - The service quality performance survey could provide a reference for conducting the survey continuously which could help develop a systematic benchmark in matching service delivery and expectation for future improvement. The SERVQUAL gap analysis would help identify any gaps between expectations and perceptions among various concerned parties, i.e. services providers (contractors) and direct customers (owner's frontline representatives). Practical implications - The service quality gap findings could provide a reference for the frontline representatives to organize and improve services of the building maintenance scheme to be implemented in other public rental housing units. Social implications - The paper promotes the awareness of the building maintenance contractors of the service quality to the public rental housing tenants. Originality/value - The value of this study could serve as a framework for further study in conducting service quality performance survey in other public housings and extend the performance measurement approach to other similar tasks in construction project areas.

Item Type: Article
Uncontrolled Keywords: China; contractor performance assessment; housing; service quality; service quality assurance
Index terms: repair, China, housing, construction project, methodology, service quality, questionnaire, tenant, survey, maintenance contractor, building maintenance, dimension, public housing, owner, inspection, contractor performance, performance measurement, Hong Kong, satisfaction, service delivery, gap analysis
Subjects: production management, service delivery, Geography, contract management, performance measurement, maintenance engineering, research methods, quality assurance, sociology, practitioner, data collection methods, construction type, project delivery, health monitoring assessment and metrics
Topics: Stakeholder Management, Roles and Professions, Construction Technology, Business Strategy, Health and Safety, Research Practice, Geographical Context, Project Management, Contract Administration, Quality Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here