Using control systems to improve construction project outcomes

Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988

Abstract

Purpose-The purpose of this paper is to identify control systems that give rise to better construction project performance; and develop and test project performance predictive models based on control systems adopted in the project. Design/methodology/approach-Research design was questionnaire survey. Data were collected via Electronic mails. The sampling frame was Singapore-based construction firms. Findings-In all, 16 control mechanisms are significantly correlated with project outcomes. The more important control mechanisms are: adequacy of project information to develop the project schedule; adequacy of float in the schedule; and quality of techniques used to support risk identification. Two relatively robust predictive models were constructed and validated to predict schedule and quality outcomes of construction projects. Schedule performance may be predicted by adequacy of float and stringency of criteria to select suppliers. Quality outcome is most significantly affected by competency of quality manager, rather than the hard systems adopted in the project. Research limitations/implications-The limitations include low response rate, and subjective nature of the five-point Likert scale used to rate project outcomes and extent to which control mechanisms were adopted in the project. Practical implications-The implication of the findings is that merely having good project management practices and adequate resources are not sufficient to achieve good project outcomes. Instead, construction projects need to have control systems in place, as they play an important role in project outcomes. Originality/value-The paper has shown empirically that control systems affect project outcomes. They are needed not just to control the project, but also help the project to achieve good outcomes. The research designed and tested two relatively robust models to predict schedule and quality outcomes of a project. These models may be used to make an initial assessment of the project's likely outcome, based on the control systems that contractors are going to adopt.

Item Type: Article
Uncontrolled Keywords: control systems; cost control; performance monitoring; quality control; time-based management
Index terms: Singapore, project outcome, research design, project performance, sampling, quality control, schedule performance, project management practice, manager, construction firm, risk identification, survey, performance monitoring, Likert scale, questionnaire, control system, cost control, construction project, methodology
Subjects: project delivery, financial and cost management, organization, research design and methodology, project completion, data collection methods, practitioner, project controls, monitoring and control systems, research methods, financial risk, project management theory and practice, Geography, production management, monitoring and control
Topics: Quality Management, Time Control, Research Practice, Project Management, Geographical Context, Business Strategy, Cost Management, Governance, Roles and Professions
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here