Exploring critical delivery selection risk factors for transportation design and construction projects

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Abstract

Purpose - The purpose of this paper is to investigate the impact of risk on the project delivery selection process of three primary methods in use in the USA, including design-bid-build (DBB); design-build (DB); and construction manager/general contractor (CMGC). Design/methodology/approach - The review of empirical studies, national survey questionnaire, multivariate analysis, and cross-validating discussion are adopted for this research. The risk factors were identified through an exhaustive literature review and empirical studies that included more than $10 billion of transportation projects. Experts with an average of 25 years of professional experience related to risk and project delivery methods in the transportation industry were invited to participate in the survey. Findings - There were six critical risk factors for DBB, seven for DB, and six for CMGC. These critical risk factors are ranked differently from each delivery method. The most critical risk factor for DBB is construction risk, for DB is scope risk, and for CMGC is constructability and documentation risk. Research limitations/implications - Knowledge of the risk factors will allow researchers to better understand the impact of risk on DBB, DB, and CMGC projects. The chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. The future research may take into account the role of participant's risk aversion in project delivery decision frameworks. Practical implications - Transportation agencies and other practitioners can use these risk factors to make more effective and defensible decisions on which delivery method is the most suitable for their projects. The result from this study provides a foundation for decision makers to use a risk-based approach in the project delivery decision. Originality/value - This research is the first attempt to examine the impact of risk on the project delivery selection process.

Item Type: Article
Uncontrolled Keywords: USA; factor analysis; risk; transportation; procurement; project delivery methods
Index terms: multivariate analysis, general contractor, transportation project, literature review, survey, documentation, methodology, practitioner, construction manager, validation, questionnaire, national survey, decision framework, transportation agency, delivery method, design-bid-build, empirical study, design and construction, risk factor, factor analysis, constructability, project delivery
Subjects: practitioner, profession, data collection methods, project delivery, data analysis and analytics, contractual arrangements, research products and data, professional development, construction integration, research methods, statistical analysis, transportation engineering, environmental hazards, infrastructure and transport systems, decision analysis, delivery method
Topics: Engineering Principles, Information Management, Research Practice, Roles and Professions, Risk Management, Sustainability, Procurement, Design Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here