Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Abstract

Purpose Although scientific research community has shown considerable interest in identifying critical success factors (CSFs) for public-private partnership (PPP) projects, yet effort at assessing and compare CSFs within similar PPP infrastructure projects received scant attention. The purpose of this paper is to identify, assess, and compare the CSFs in PPP transport infrastructure projects. Design/methodology/approach The study adopted literature review and three PPP case studies including structured interviews and review of documentary reports in each case study. The outcome of literature review provided a total list of 26 identified success factors, which was used to design a case study protocol using failure mode and effect analysis (FMEA) technique. FMEA was conducted on each 26 identified success factor to assess their criticality in the three PPP case studies. Findings The results of FMEA revealed a total of ten CSFs in the concession of the road; four CSFs in the concession of the airport; and eight CSFs in the concession of the seaport. Also, the cross-case analysis showed the three prevalent CSFs, this includes government involvement by providing guarantees, political support, and project economic viability. Practical implications The study findings including lessons learnt in each case study would positively influence policy development towards PPP transport infrastructure projects and the manner in which partners (i.e. public and private sector) go about the development of PPP transport projects. Originality/value This research would help PPP stakeholders to focus their attention and priorities in managing the identified CSFs in achieving long-term success in PPP transport infrastructure projects implementation.

Item Type: Article
Uncontrolled Keywords: Nigeria; critical success factors; developing countries; partnership; procurement; private finance
Index terms: Nigeria, private finance, partnership, private sector, case study, failure mode, infrastructure project, implementation, success factor, literature review, transport infrastructure, guarantee, interview, developing country, critical success factor, cross-case analysis, methodology
Subjects: health monitoring assessment and metrics, data analysis and analytics, contractual arrangements, reliability engineering, control systems, data collection methods, infrastructure and transport systems, industry analysis, partnership management, development economics, Geography, research methods, contract structure
Topics: Procurement, Stakeholder Management, Research Practice, Project Management, Geographical Context, Engineering Principles, Business Strategy, Health and Safety, International Construction
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here