Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988

Abstract

An investigation of the impact of beamless and beam-supported building floors on formwork labour productivity presents guidance to estimators and project managers for reasonable cost estimation, effective planning and efficient labour utilisation.

Item Type: Article
Uncontrolled Keywords: efficiency; buildability; building floors; formwork; labour productivity; reinforced concrete construction
Index terms: buildability, investigation, formwork, building floor, estimator, productivity, reinforced concrete construction, efficiency, beam, labour utilization, labour productivity, project manager, cost estimating
Subjects: architectural elements, financial and cost management, performance management, management, data collection methods, profession, structural engineering, design efficiency, building construction
Topics: Quality Management, Site Management, Business Strategy, Human Resources, Cost Management, Construction Technology, Engineering Principles, Design Practice, Research Practice, Roles and Professions
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here