Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988
Abstract
Purpose The purpose of this paper is to investigate the empirical relationship between mechanical, electrical, and piping (MEP) project procurement systems and project performance in the context of the Saudi Arabian construction industry. The study plans to expand the understanding of the relationship of design-bid-build (DBB) and design-build (DB) performance with respect to change order rate, cost growth, and schedule growth. Design/methodology/approach The paper statistically analyzed 207 MEP projects. It investigates the relationship of project procurement systems and three project performance indicators. Hypotheses testing was used to assess the relationship. Findings The results show that projects using the DB procurement system are more likely to have less cost overrun and experience a lower change order rate compared to DBB for pricing and selection methods, yet neither procurement system had an advantage over the schedule duration based on the study’s sample. Research limitations/implications The lack of information identifying the cause of contract change orders limits the interpretation of the findings. Sample sizes in some of the test criteria were statistically small, thus limiting the reliability or confidence level of the analysis for those samples. Caution should be used when interpreting the results as representative of the Saudi Arabian construction industry as a whole; due to the owner’s project execution policies, procedures, and standards, the level of enforcement of those practices may differ from other owners. Originality/value The paper fulfills and identified the relationship between the project procurement system and MEP project performance in the context of the Saudi Arabian construction industry.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Saudi Arabia; design-build; design-bid-build; procurement system; project cost |
| Index terms: | design-bid-build, change order, owner, sample size, cost overrun, hypotheses testing, Saudi Arabia, pricing, duration, construction industry, enforcement, schedule growth, project performance, procurement system, project cost, selection method, project procurement, methodology |
| Subjects: | contractual arrangements, economic analysis, financial and cost management, research design and methodology, quantitative and statistical methods, project controls, sociology, industry analysis, economics, tendering, research methods, Geography, health safety and environment, contractual condition, project management theory and practice |
| Topics: | Stakeholder Management, Procurement, Health and Safety, Cost Management, Business Strategy, Geographical Context, Project Management, Research Practice, Contract Administration, Time Control |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here