A systematic approach for public-private partnership projects CSFs evaluation

Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988

Abstract

Purpose: Public–private partnership (PPP) projects are increasingly significant in many countries. The purpose of this paper is to assess the impact of critical success factors (CSFs) on PPP projects and comprehensively consider the interrelations and interaction among dimensions and factors to achieve a better understanding of PPP project management. Design/methodology/approach: An evaluation index system for PPP projects such as the presented case study is proposed based on a literature review and a survey. Then, interpretative structural modeling is used to transform the CSFs dimension into a multi-level hierarchical model to reflect the driven-dependency relation of each dimension; the fuzzy analytic network process model optimized by moment estimation theory is used to investigate the impact of CSFs by considering their internal impact. Findings: Regarding the project used as the case study, the driving force and dependence for driving layer and dependent layer are determined. Moreover, in driving layer, efficient and well-structured payment mechanism is the most important CSF if considering the internship and interaction among CSFs, and efficient and well-structured payment mechanism and good governance provide most positive interaction; in dependent layer, population of beneficiaries is the most important CSF if considering the internship and interaction among CSFs, and public client’s satisfaction provides most positive interaction. Originality/value: This paper developed an evaluation model to explore the interrelationships of dimensions and factors and then determine the impact of CSFs. The model propose in this paper relaxes the independence assumptions of traditional methods and is more in line with reality; besides, weighting method is optimized to obtain more objective and reasonable evaluation results. Through an empirical study, the validity of the model has been verified; therefore, the study can help project stakeholders better understand the CSFs and further improve project performance.

Item Type: Article
Uncontrolled Keywords: approach; case study; engineering; management
Index terms: literature review, survey, methodology, population, project stakeholder, critical success factor, internship, case study, satisfaction, governance, partnership, validity, estimation, empirical study, structural modelling, project performance, interaction, public client, analytic network process, dimension, project management, payment mechanism
Subjects: research methods, project management theory and practice, professional development, partnership management, demography, sociology, decision-making and optimization, behavioral psychology, data collection methods, evaluation and assessment methods, business, control systems, data analysis and analytics, health monitoring assessment and metrics, economic analysis, financial and cost management, project delivery, analytical methods
Topics: Urban Studies, Governance, Stakeholder Management, Engineering Principles, Information Management, Project Management, Research Practice, Health and Safety, Cost Management, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here