Restructuration of architectural practice in integrated project delivery (IPD): Two case studies

Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988

Abstract

Purpose: The purpose of this paper is to clarify that while integrated project delivery (IPD) methods can be momenta for restructuring architectural practice, they do not predetermine specific patterns of restructuration for the roles, responsibilities and services of architects. Design/methodology/approach: This paper is based on a multiple case study design; two IPD projects were theoretically sampled and studied. The data collection methods included semi-structured interviews and observations. An inductive data analysis approach was applied to frame the phenomena, conduct cross-case comparisons and develop propositions. Findings: While IPD implementations set expectations for new structures for practices, it is the project participants' situated decisions that lead to the restructuration of some dimensions of architectural practice. The dimensions in this study included team formation, design leadership and collaboration and architectural services. IPD project participants locally changed and redefined conventional roles, responsibilities and project artifacts (e.g. drawings and models) that concerned design development and coordination. Practical implications: IPD context, by itself, does not predetermine a fixed pattern of change in establishing designers' roles, responsibilities and services because restructuration is highly negotiated amongst the IPD parties and can lead to different responses to this contractual setting. Contracts set expectations for collaborative behavior, but the fulfillment of these expectations is situated and emerging as project participants negotiate to develop practices. Originality/value: While IPD research and guidelines aim to provide recipes for IPD implementation, this study contributes to the body of knowledge by clarifying that IPD is a context in which unprecedented ways of practice restructuration could emerge.

Item Type: Article
Uncontrolled Keywords: architectural practice; architecture; case study; design management; integrated practice; integrated project delivery; integration; IPD; restructuration
Index terms: dimension, design development, implementation, coordination, architectural practice, architectural service, architect, integrated practice, designer, case study, body of knowledge, collaboration, integration, design management, methodology, integrated project delivery, artifact, drawing, interview, cross-case comparison, data analysis
Subjects: profession, data collection methods, business, technical documentation, knowledge management, contractual arrangements, data analysis and analytics, health monitoring assessment and metrics, management, research methods, practice management, design process, organizational analysis, sociology
Topics: Business Strategy, Health and Safety, Research Practice, Information Management, Roles and Professions, Procurement, Design Practice, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here