Barriers in contractual scope management of international development projects in Afghanistan

Hilali, A; Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(8), pp. 1574-1592. ISSN 0969-9988

Abstract

Purpose: For construction and management, the existing codes of practice of international organizations such as US Army Corps of Engineers, the Asian Development Bank, the World Bank, the United Nations Office for Project Services, etc., often prove ineffective when applied in post-war countries like Afghanistan. Domestic contractors faced maximum challenges in contractual scope management, which was implemented by such organizations based on their existing codes of practice. The purpose of this paper is to understand these barriers in scope management as faced by the domestic contractors of Afghanistan. Design/methodology/approach: The research employs a mixed methodology to cater to its objectives. Face-to-face structured interviews of 14 industry experts and extensive literature review were conducted to identify unique barriers pertaining to Afghanistan construction industry. Further, quantitative assessment of these barriers through the statistical tools of “mean score ranking,” “Kendall’s test” and “independent sample t-test” was carried out to understand the severity of the barriers. Findings: In total, 39 unique barriers were identified under the groups of “scope formulation,” “scope completeness,” “scope pricing,” “scope implementation” and “scope change control.” The consequential impacts of these barriers and their existence at different stages of the project were illustrated. The most severe barriers were identified as the “inadequacy of site investigation reports” and the “unavailability of resources in local markets.” Originality/value: The understanding of the challenges faced by local stakeholders, as highlighted by this study, can be utilized by these international organizations in their strategy and planning to ensure successful projects while also propagating the adoption of sustainable construction practices.

Item Type: Article
Uncontrolled Keywords: Afghanistan; barriers; construction; international construction; international development projects; international practice; project management; scope management
Index terms: international practice, methodology, international development project, strategy, literature review, face, sustainable construction practice, scope change, interview, project management, implementation, construction industry, markets, Afghanistan, international construction, codes of practice, war, site investigation, United Nations, World Bank, engineer, pricing, international organization
Subjects: profession, strategic management, data collection methods, scope management, psychology, economic analysis, institutional frameworks, data analysis and analytics, contractual arrangements, research methods, management, project management theory and practice, sustainable construction, Geography, conflict and crisis studies, geotechnical engineering, regulatory law, industry analysis
Topics: International Construction, Legal Issues, Organizational Design, Engineering Principles, Project Management, Geographical Context, Research Practice, Business Strategy, Governance, Sustainability, Procurement, Roles and Professions
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here