Predicting the project time and costs using EVM based on gray numbers

Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988

Abstract

Purpose: The purpose of this paper is to determine the project completion time and cost under non-deterministic conditions using interval gray numbers (IGNs). Design/methodology/approach: The earned value management (EVM) method based on the IGN has been developed. Findings: The EVM method based on the IGN has been verified by a numerical example that can be applied to construction projects. Practical implications: The EVM method, based on the gray numbers, reduces the budget and time shortage risk. Also, using this method, the managers would not be restricted to provide very exact values in their progress reports in the non-deterministic conditions. Originality/value: One notable and significant point in all projects during the execution process is to estimate the project completion time and cost. However, non-deterministic conditions for both planned and actual physical completion percentage of projects have not been considered for predicting the project completion time and cost in the literature. Therefore, the novelty of this paper is the prediction of project completion time and cost under non-deterministic conditions using IGN.

Item Type: Article
Uncontrolled Keywords: estimating; gray numbers; project cost prediction; project management; project time prediction; uncertainty
Index terms: project cost, earned value management, manager, estimating, completion time, methodology, construction project, time prediction, project management, estimate
Subjects: operations research, financial and cost management, practitioner, control systems, project controls, research methods, economics, project management theory and practice, production management
Topics: Time Control, Cost Management, Project Management, Research Practice, Roles and Professions
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here