Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988

Abstract

Purpose: Various factors may influence project finance when a multi-sourced debt financing strategy is used for financing capital investments, in general, and public infrastructure investments, in particular. Traditional indicators lack comprehensive consideration of the influences of many internal and external factors, such as investment structure, financing mode and credit guarantee structure, which exist in the financing decision making of BOT projects. An effective approach is, thus, desired. The paper aims to discuss these issues. Design/methodology/approach: This paper develops a financial model that uses an interval number to represent the uncertain factors and, subsequently, conducts a standardization of the interval number. Decision makers determine the weight of each objective through the analytic hierarchy process. Through the optimization procedure, project investors and sponsors are provided with a strategy regarding the optimal amount of debt to be raised and the insight on the risk level based on the net present value, as well as the probability of bankruptcy for each different period of debt service. Findings: By using an example infrastructure project in China and based on the comprehensive evaluation, comparison and ranking of the capital structures of urban public infrastructure projects using the interval number method, the final ranking can help investors to choose the optimal capital structure for investment. The calculation using the interval number method shows that X2 is the optimal capital structure plan for the BOT project of the first stage of Tianjin Binhai Rail Transit Z4 line. Therefore, investors should give priority to selecting a capital contribution ratio of 45 per cent for this investment. Research limitations/implications: In this paper, some parameters, such as depreciation life, construction period and concession period, are assumed to be deterministic parameters, although the interval number model has been introduced to analyze the uncertainty indicators, such as total investment and passenger flow, of BOT rail transport projects. Therefore, more of the above deterministic parameters can be taken as uncertainty parameters in future research so that calculation results fit actual projects more closely. Originality/value: This model can be used to make the optimal investment decision for a project by determining the impact of uncertainty factors on the profitability of the project in its lifecycle during the project financial feasibility analysis. Project sponsors can determine the optimal capital structure of a project through an analysis of the irregular fluctuation of the unpredictable factors in project construction such as construction investment, operating cost and passenger flow. The model can also be used to examine the effects of different capital investment ratios on indicators so that appropriate measures can be taken to reduce risks and maximize profit.

Item Type: Article
Uncontrolled Keywords: decision support systems; novel model; optimization; project management; risk management; strategic management
Index terms: public infrastructure, concession period, investor, net present value, operating cost, profitability, risk management, lifecycle, standardization, debt financing, investment decision, capital structure, project management, bankruptcy, infrastructure project, capital investment, guarantee, decision support, project sponsor, profit, strategy, methodology, decision-making, strategic management, financing, project finance, China
Subjects: project delivery, economic analysis, risk assessment, infrastructure and transport systems, decision analysis, sociology, Geography, financial risk, project management theory and practice, financial management, management, contract structure, performance measurement, research methods
Topics: Project Management, Geographical Context, Research Practice, Engineering Principles, Business Strategy, Cost Management, Procurement, Stakeholder Management, Risk Management, Quality Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here