Development of a prototype building design management tool

Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Abstract

This paper describes techniques that are being developed to model the process of detailed building design and from this, to determine design sequences and produce design programmes. The basis of the methodology is that it will enable design activities to be programmed and monitored based on the production of information rather than the completion of design deliverables such as drawings and specifications. The relative importance of information within the design process will be analysed allowing the process to be programmed in such a way that an optimum design sequence can be achieved and areas of work requiring tasks to be undertaken in an iterative manner can be identified. The allocation of resources and estimate of duration of tasks within iterative groups can then be undertaken more effectively. The methodology will also enable the effect of external influences, such as the procurement programme, on the design sequence to be analysed, and the overall process of design, procurement and construction to be reviewed.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: design; management; matrix analysis; modelling; planning
Index terms: modelling, estimate, duration, methodology, drawing, prototype, building design management, programme, building design, relative importance, design process, specification, matrix analysis
Subjects: contractual condition, design process, research methods, project controls, design methods, risk assessment, data science, analytical methods, financial and cost management, architectural design, technical documentation, modelling and simulation
Topics: Contract Administration, Time Control, Design Practice, Risk Management, Cost Management, Engineering Principles, Research Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here