Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement

Mellado, F; Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(2), pp. 579-608. ISSN 0969-9988

Abstract

Purpose: There is a long-standing interest in performance improvement within the construction industry. Approaches based upon cost, time and quality (often called the Iron Triangle), have been the focus of attention despite criticism of the validity of the Iron Triangle as a performance measure due to its simplistic approach. Furthermore, little emphasis has been placed on synthesising performance to understand whether this concept has evolved from the traditional view. An analysis of prominent literature was reviewed by classifying performance indicators which establish criteria for measuring performance in the construction industry. The purpose of this paper is to review the literature (1998–2018) on performance at a project level to determine a final rank of key performance indicators (KPIs) which will establish how projects are currently being measured. Design/methodology/approach: This paper uses a combined qualitative and quantitative approach – a comprehensive literature review on overall performance at a project level and the statistical Kendall’s W test to find concordance among the authors on performance in the construction industry to determine a final rank of KPIs. Findings: The results demonstrate there is no congruent correlation on what performance is and the traditional iron triangle of “cost-time-quality” is still the preferred method of analysing performance, despite it being proven to be ineffective. Originality/value: Performance in the construction industry is an ambiguous concept that can be interpreted differently by the construction industry’s stakeholders. Despite this lack of concordance, a starting point on the definition of performance can be obtained from the literature. The paper presents a final rank of KPIs.

Item Type: Article
Uncontrolled Keywords: construction; integrated practice; management; project management
Index terms: key performance indicator, validity, integrated practice, performance improvement, construction industry, project management, performance indicator, performance measure, literature review, methodology
Subjects: evaluation and assessment methods, project delivery, data analysis and analytics, performance management, research methods, performance measurement, management, project management theory and practice, industry analysis
Topics: Quality Management, Business Strategy, Research Practice, Project Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here