ANN-based prediction intervals to forecast labour productivity

Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988

Abstract

Purpose: This study aims to propose the adoption of artificial neural network (ANN)-based prediction intervals (PIs) to give more reliable prediction of labour productivity using historical data. Design/methodology/approach: Using the proposed PI method, various sources of uncertainty affecting predictions can be accounted for, and a PI is proposed instead of a less reliable single-point estimate. The proposed PI consists of a lower and upper bound in which the realization of the predicted variable, namely, labour productivity, is anticipated to fall with a defined probability and represented in terms of a confidence level (CL). Findings: The proposed PI method is implemented on a case study project to predict labour productivity. The quality of the generated PIs for the labour productivity is investigated at three confidence levels. The results show that the proposed method can predict the value of labour productivity efficiently. Practical implications: This study is the first attempt in construction management to undertake a shift from deterministic point predictions to interval forecasts to improve the reliability of predictions. The proposed PI method will help project managers obtain accurate and credible predictions of labour productivity using historical data. With a better understanding of future outcomes, project managers can adopt appropriate improvement strategies to enhance labour productivity before commencing a project. Originality/value: Point predictions provided by traditional deterministic ANN-based forecasting methodologies may be unreliable due to the different sources of uncertainty affecting predictions. The current study proposes ANN-based PIs as an alternative and robust tool to give a more reliable prediction of labour productivity using historical data. Using the proposed method, various sources of uncertainty affecting the predictions are accounted for, and a PI is proposed instead of a less reliable single point estimate.

Item Type: Article
Uncontrolled Keywords: labour productivity; neural networks; prediction interval; uncertainties
Index terms: case study, project manager, forecasting, estimate, labour productivity, strategy, neural network, artificial neural network, methodology, upper bound
Subjects: probability and distributions, research methods, management, data collection methods, profession, financial and cost management, prediction and forecasting, artificial intelligence, modelling and simulation
Topics: Research Practice, Business Strategy, Cost Management, Roles and Professions, Digital Applications, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here