Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry

Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988

Abstract

Purpose: The purpose of this paper is to develop a framework for implementing lean construction and consequently to improve performance levels in the construction industry in the context of Saudi Arabia. There is currently no framework for implementing lean construction specifically tailored to the Kingdom of Saudi Arabia (KSA) construction industry. Existing lean construction frameworks are focussed on other countries and are less applicable in the KSA due to differences in socio-cultural and operational contexts. Design/methodology/approach: This study employs the interpretive structural modelling (ISM) technique for data collection and analysis. First, following a survey of 282 construction professionals, 12 critical success factors (CSFs) for implementing lean construction in the KSA construction industry were identified by Sarhan et al. (2016). Second, 16 of these professionals who have 15 years or more experience were exclusively selected to examine the contextual relationship among the 12 CSFs. A row and column questionnaire was used for a pairwise comparison of the CSFs. A matrix of cross-impact multiplications (MICMAC) was applied to analyse the questionnaire data to develop an ISM model that can serve as a framework for implementing lean construction. Third, the framework was subjected to further validation by interviewing five experts to check for conceptual inconsistencies and to confirm the applicability of the framework in the context of the KSA construction industry. Findings: The findings reveal that the CSFs are divided into four clusters: autonomous, linkage, dependent and driving clusters. Additionally, the findings reveal seven hierarchies of inter-relationships among the CSFs. The order of practical application of the CSFs descends from the seventh hierarchy to the first hierarchy. Originality/value: The new framework is a significant advancement over existing lean construction frameworks as it employs an ISM technique to specify the hierarchical relationships among the different factors that contribute to the successful implementation of lean construction. The primary value of this study is the development of a new framework that reflects the socio-cultural and operational contexts in the KSA construction industry and can guide the successful implementation of lean construction. Therefore, construction industry operators such as contractors, consultants, government departments and professionals can rely on the framework to implement lean construction more effectively and successfully.

Item Type: Article
Uncontrolled Keywords: construction; construction site; engineering; management; project management
Index terms: linkage, interpretive structural modelling, Kingdom of Saudi Arabia, Saudi Arabia, implementation, construction industry, project management, construction professional, strategy, construction site, survey, column, lean construction, critical success factor, methodology, questionnaire, validation
Subjects: research methods, management, structural engineering, professional development, project management theory and practice, Geography, building construction, industry analysis, business, data collection methods, control systems, work location, contractual arrangements, data analysis and analytics
Topics: Business Strategy, Project Management, Geographical Context, Research Practice, Information Management, Engineering Principles, Procurement, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here