Wang, D; Fu, H and Fang, S (2020) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects: The moderating role of contractual control. Engineering, Construction and Architectural Management, 27(1), pp. 150-167. ISSN 0969-9988
Abstract
Purpose: The low success rate of megaprojects stems from the opportunism triggered by uncertainty. Developing trust between participants is an effective means to reduce uncertainty, but this process is inevitably affected by contracts. The purpose of this paper is to examine the impact of uncertainty on participants' opportunism in megaprojects and the effect of trust on reducing uncertainty. At the same time, the moderating effects of contractual control are tested. Design/methodology/approach: This research classifies trust into competence-based trust and goodwill-based trust and categorizes uncertainty into environmental uncertainty and behavioral uncertainty. Partial least squares structural equation modeling is used to test the hypotheses based on data collected from 172 respondents. Findings: The results show a positive correlation between the two types of uncertainty and opportunism. For the governance of uncertainty, competence-based trust can reduce environmental uncertainty, but it is ineffective for behavioral uncertainty, and goodwill-based trust has a significant effect on both types of uncertainty. The test of moderating effects shows that contractual control strengthens the effect of competence-based trust but weakens the effect of goodwill-based trust, which means that contractual control complements competence-based trust and substitutes for goodwill-based trust. Research limitations/implications: This research enriches the theory of megaproject management. First, it validates the role of competence-based trust and goodwill-based trust in reducing the different types of uncertainty in megaprojects. Second, this study clarifies the substitution or complementarity between contractual control and different dimensions of trust in the context of high uncertainty, which provides a comprehensive answer to prior research inconsistencies on contractual control and trust. Practical implications: For practice, this research provides some implications for megaproject management. First, project managers should recognize that the match between trust and project uncertainty is key to the success of megaproject governance. For example, some megaprojects involve many organizations, and there are many difficulties in behavioral supervision and performance appraisal. Therefore, developing goodwill-based trust between participants through positive interactions is an effective means to reduce the behavioral uncertainty of all participants and to curb opportunistic behaviors. Originality/value: This research validated the role of competence-based trust and goodwill-based trust in reducing the different types of uncertainty in megaprojects. Furthermore, it clarifies the substitution or complementarity between contractual control and different dimensions of trust in the context of high uncertainty, which provides a comprehensive answer to prior research inconsistencies on contractual control and trust.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction; engineering; organization; project management |
| Index terms: | methodology, competence, effect of trust, partial least square, appraisal, megaproject, opportunism, project uncertainty, structural equation modelling, opportunistic behaviour, interaction, environmental uncertainty, dimension, project management, supervision, project manager, governance |
| Subjects: | business, profession, control systems, strategic project management, health monitoring assessment and metrics, research methods, factor and component analysis, financial risk, project management theory and practice, personnel development, sociology, behavioral psychology, statistical analysis |
| Topics: | Governance, Roles and Professions, Research Practice, Project Management, Health and Safety, Cost Management, Organizational Design, Human Resources |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here