Wang, S; Tang, J; Zou, Y and Zhou, Q (2020) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(4), pp. 850-871. ISSN 0969-9988
Abstract
Purpose: The purpose of this paper is to investigate the process optimization of a precast concrete component production line by using value stream mapping. Design/methodology/approach: This paper is an empirical focused on of lean production theory and value stream mapping. The data in the case study were collected in real time on-site for each process during the production process of a prefabricated exterior wall. Findings: The results of the current value stream map indicate that the main problems of the current production process are related to equipment, technology and organization. The equipment problems include simple demolding and cleaning tools and the lack of professional transfer channels. The technology problems include the lack of a marking mechanism and pipeline exit mechanism. There is a lack of standard operating procedures and incomplete process convergence. A comparison and analysis of the current value stream and the future value flow indicate that optimizations of the process flow, the production line layout, and the standard operating procedures have shortened the delivery cycle, reduced the number of workers, improved the operator’s operating level and balanced the production line. Practical implications: The results of this study provide practitioners with a clear understanding of the optimization of the precast concrete component production and represent a method and basis for the process optimization of a factory production line; the approach is suitable for process optimization in other areas. Originality/value: This research represents an innovative application of lean production theory and value stream mapping in a complex production line of precast concrete components and thereby fills the gap between the theory and practice of the optimization of a precast concrete component production line.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | case study; optimization; process; productivity; project management |
| Index terms: | pipeline, case study, productivity, value stream mapping, value stream, real time, precast concrete, project management, cleaning, value stream map, standard operating procedure, production process, lean production, methodology, practitioner |
| Subjects: | business, data collection methods, process management, practitioner, building materials, maintenance engineering, lean construction, research methods, management, manufacturing engineering, project management theory and practice, project controls, infrastructure and transport systems |
| Topics: | Roles and Professions, Research Practice, Project Management, Engineering Principles, Construction Materials, Business Strategy, Time Control, Quality Management, Value Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here