Items where Author is "Hildreth, J C"

Group by: Item Type | No Grouping
Number of items: 4.

Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

This list was generated on Sun Aug 23 01:21:04 2026 UTC.