Items where Author is "Yılmaz, M"
Group by: Item Type | No Grouping
Number of items: 1.
Yılmaz, M and Dede, T (2026) Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem. Engineering, Construction and Architectural Management, 33(1), pp. 380-412. ISSN 0969-9988
Up a level