Items with Index Term: priority rating
Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Perera, G; Tennakoon, T; Kulatunga, U; Jayasena, H S and Wijewickrama, M (2021) Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(4), pp. 611-626. ISSN 2044-124X
Up a level