Items with Index Term: statistical fuzzy model

Number of items: 4.

Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Kholy, A M (2021) Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. International Journal of Construction Management, 21(7), pp. 694-712. ISSN 1562-3599

This list was generated on Sun Aug 23 02:22:51 2026 UTC.