Items with Index Term: JCT

Number of items: 19.

Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193

Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Brawn, D (2012) Extensions of time and liquidated damages in construction contracts in England and Wales. International Journal of Law in the Built Environment, 4(1), pp. 75-90. ISSN 1756-1450

Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.

Crowe, P (2014) Motivation agenda for social empowerment and respect for people during the drafting of construction contracts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.

Donohoe, S and Coggins, J K (2016) Framework agreements in a post-recession economy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

McLernon, T (2014) A study of the management of time by comparing and evaluating the provisions for the management of time in the JCT standard building contract (JCT sbc), the new engineering and construction contract (nec3) and the new complex projects contract 2013 (cpc20. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Pain, J (1988) Design-build and the traditional approach: A comparative study with particular reference to the JCT 'with contractor's design' 1981 form of contract. PhD thesis, University of Reading, UK.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193

Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.

Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531

Wood, H L and Ashton, P (2007) An investigation to identify the role of pre-construction site investigative information used by small medium sized enterprises (SME). In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

This list was generated on Sun Aug 23 02:19:36 2026 UTC.