Items with Index Term: multidisciplinary team

Number of items: 26.

Boehm, S and Kopec, D (2016) Interior design as a post-disaster team partner. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 276-289. ISSN 1759-5916

Capra, M (2010) Collaborative mixed reality environments: an application for civil engineering. PhD thesis, University of Nottingham, UK.

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2013) Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), pp. 1128-1143. ISSN 1466433X

Chen, L and Whyte, J (2022) Understanding design change propagation in complex engineering systems using a digital twin and design structure matrix. Engineering, Construction and Architectural Management, 29(8), pp. 2950-2975. ISSN 0969-9988

Dsouza, M; Phadtare, A; Vyas, S S; Shinde, Y and Jadhav, A (2024) Toward resilient development in rural area: some strategic recommendations based on contextual findings in Bhokardan Taluka, Jalna. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 699-727. ISSN 1759-5916

Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007

Gane, V (2011) Design scenarios methodology: enabling requirements-driven design spaces. PhD thesis, Stanford University, USA.

Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218

Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218

Kleiner, B M; Smith-Jackson, T L; Mills, T H; O'Brien, M and Haro, E (2008) Design, development, and deployment of a rapid universal safety and health system for construction. Journal of Construction Engineering and Management, 134(4), pp. 273-279. ISSN 0733-9364

Lefebvre, G (2009) The influence of the psychological characteristics of the team members on construction project performance. PhD thesis, University of Salford, UK.

Leon, M (2015) Development of a computer mediated multidisciplinary design protocol and its application to the early architectural design stages. PhD thesis, Robert Gordon University, UK.

Longwe, T; Lord, W and Carrillo, P (2015) The impact of employee experience in uptake of company collaborative tool. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X

Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988

Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364

Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.

Ohueri, C. C.; Liew, S. C.; Bamgbade, J. A. and Enegbuma, W. I. (2026) Critical components for successful BIM-based sustainable building design collaboration: Structural equation model analysis. Journal of Engineering, Design and Technology, 24(2), pp. 472-493. ISSN 1726-0531

Oliveira, L A and Melhado, S B (2011) Conceptual model for the integrated design of building façades. Architectural Engineering and Design Management, 7(3), pp. 190-204. ISSN 1745-2007

Robert, J; Moulet, L; Lizarralde, G; Davidson, C H; Nie, J and da Sylva, L (2006) Finding out: A system for providing rapid and reliable answers to questions in the construction sector. Construction Innovation, 6(4), pp. 250-261. ISSN 1471-4175

Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364

Solnosky, R; Parfitt, M K and Holland, R (2015) Delivery methods for a multi-disciplinary architectural engineering capstone design course. Architectural Engineering and Design Management, 11(4), pp. 305-324. ISSN 1745-2007

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364

Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.

de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007

This list was generated on Sun Aug 23 02:38:45 2026 UTC.