Items where Author is "Yang, S"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 9.

Article

Zhang, Q; Liu, Z and Yang, S (2025) Enhancing construction workers' health and safety: Mechanisms for implementing construction 4.0 technologies in construction organizations. Engineering, Construction and Architectural Management, 32(13), pp. 68-103. ISSN 0969-9988

Xiang, P; Yang, S; Yuan, Y and Li, R (2025) Integrated measurement of public safety risks in international construction projects in the belt and road initiative. Engineering, Construction and Architectural Management, 32(7), pp. 4673-4699. ISSN 0969-9988

Yang, S; Guan, T; Wang, J; Wang, X and Ren, B (2025) Label scarcity- and class imbalance-aware current-based pipeline for concrete vibration activity recognition. Journal of Construction Engineering and Management, 151(10): 04025135, ISSN 0733-9364

Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yang, S; Cui, G; Abdal Noor, B and Lu, S (2022) Balance between affect and outcome control or face and behaviour control for better learning: Evidence from Chinese engineering project team. International Journal of Construction Management, 22(8), pp. 1432-1442. ISSN 1562-3599

Liu, Y; Jarvamardi, A; Zhang, Y; Liu, M; Hsiang, S M; Yang, S; Yu, X and Jiang, Z (2021) Comparative study on perception of causes for construction task delay in China and the United States. Journal of Construction Engineering and Management, 147(3): 04020176, ISSN 0733-9364

Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364

Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988

This list was generated on Sun Aug 23 01:29:40 2026 UTC.