Items where Author is "Harris, F C"
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193
Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364
Edwards, D J; Holt, G D and Harris, F C (1999) Predicting maintenance expenditure on construction plant: Model development and performance analysis. Journal of Financial Management of Property and Construction, 4(1), pp. 31-46. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387
Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988
Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218
Holt, G D; Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and latham: The contractors' view. Engineering, Construction and Architectural Management, 3(1-2), pp. 97-115. ISSN 0969-9988
Zhang, P; Harris, F C and Olomolaiye, P O (1996) A computer-based model for optimizing the location of a single tower crane. Building Research & Information, 24(2), pp. 113-123. ISSN 0961-3218
Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(2), pp. 137-147. ISSN 01446193
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988
Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Srinivasan, R and Harris, F C (1991) Lane rental contracting. Construction Management and Economics, 9(2), pp. 151-155. ISSN 01446193
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193
Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193
Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(2), pp. 115-121. ISSN 01446193
Jones, D W and Harris, F C (1982) Company acquisitions and business performance in the construction industry. Construction Papers, 1(3), pp. 5-19. ISSN 0144-8587
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.