Items with Index Term: charrette

Number of items: 23.

Abraham, K A (2015) Influencing the design decision process: Information visualization in multi-criteria decision support systems for early-stage building design. PhD thesis, Stanford University, USA.

Cole, R J; Busby, P; Guenther, R; Briney, L; Blaviesciunaite, A and Alencar, T (2012) A regenerative design framework: Setting new aspirations and initiating new discussions. Building Research & Information, 40(1), pp. 95-111. ISSN 0961-3218

Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

Gibson, G E; El Asmar, M; Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(7), pp. 2669-2696. ISSN 0969-9988

Gibson, G E; Sanboskani, H; El Asmar, M and Aramali, V (2022) Employing technology to enable remote research charrettes as a method for engaging industry and uncovering best practices: A novel approach for a post-COVID-19 world. Journal of Construction Engineering and Management, 148(11): 04022122, ISSN 0733-9364

Gibson, G E and Whittington, D A (2010) Charrettes as a method for engaging industry in best practices research. Journal of Construction Engineering and Management, 136(1), pp. 66-75. ISSN 0733-9364

Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.

Hamledari, H (2021) Impact assessment of blockchain-enabled smart contracts on the visibility of construction payments. PhD thesis, Stanford University, USA.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.

Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.

Leicht, R M (2009) A framework for planning effective collaboration using interactive workspaces. PhD thesis, Pennsylvania State University, USA.

Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Sanboskani, H (2024) The implementation of integrated delivery and management in large government-owned engineering construction projects. PhD thesis, Arizona State University, USA.

Senescu, R R (2011) Design process communication methodology. PhD thesis, Stanford University, USA.

Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029

This list was generated on Sun Aug 23 03:55:54 2026 UTC.