Items with Index Term: cost planning

Number of items: 50.

Akinradewo, O I; Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects' estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(3), pp. 407-421. ISSN 1366-4387

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218

Bowen, P A and Edwards, P J (1996) Interpersonal communication in cost planning during the building design phase. Construction Management and Economics, 14(5), pp. 395-404. ISSN 01446193

Bowen, P A and Edwards, P J (1998) Building cost planning and cost information management in South Africa. Journal of Construction Procurement, 4(1), pp. 16-26. ISSN 1358-9180

Brandon, P S (1984) Cost versus quality: A zero sum game? Construction Management and Economics, 2(2), pp. 111-126. ISSN 01446193

Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: Perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(4), pp. 78-90. ISSN 2204-9029

Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.

Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708

Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gurmu, A. (2026) Forecasting building cost index with vecm: Integrating output-based indexes and macroeconomic indicators. Journal of Engineering, Design and Technology, 24(4), pp. 1012-1036. ISSN 1726-0531

Higham, A and Fortune, C (2011) Sustainable asset management (SAM) decision making: An exploration of current practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364

Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364

Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364

Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.

Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.

Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Michell, K; Bowen, P and Cattell, K (2007) Modeling the design team as a temporary management structure: Reality versus theory. Construction Economics and Building, 7(1), pp. 19-28. ISSN 2204-9029

Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193

Omotayo, D T; Tan, S W and Ekundayo, D (2023) Sustainable construction and the versatility of the quantity surveying profession in Singapore. Smart and Sustainable Built Environment, 12(2), pp. 435-457. ISSN 2046-6099

Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.

Park, S H (2009) Whole life performance tender evaluation for design-build in the Korean public sector. PhD thesis, University of Reading, UK.

Shahrin, F; Mahmood, K and Hassan, F (2021) Project cost overruns and risk allocation in public funded projects in Malaysia. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364

Soutos, M and Lowe, D J (2011) Elemental cost estimating: Current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(2), pp. 147-162. ISSN 1366-4387

Stoy, C and Kalusche, W (2006) The determination of occupancy costs during early project phases. Construction Management and Economics, 24(9), pp. 933-944. ISSN 1466433X

Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.

Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387

Swaffield, L M and Pasquire, C L (1999) Examination of relationships between building form and function, and the cost of mechanical and electrical services. Construction Management and Economics, 17(4), pp. 483-492. ISSN 01446193

Tochukwu, M G (2018) The development of 5D BIM framework to facilitate costing in contractor-led projects. PhD thesis, University of Wolverhampton, UK.

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 83-95. ISSN 0969-9988

Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531

Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X

Yap, J B H; Skitmore, M; Lim, Y W; Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(6), pp. 2415-2436. ISSN 0969-9988

Yogeshwaran, G; Perera, B A K S and Ariyachandra, M R M F (2018) Competencies expected of graduate quantity surveyors working in developing countries. Journal of Financial Management of Property and Construction, 23(2), pp. 202-220. ISSN 1366-4387

Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X

This list was generated on Sun Aug 23 02:08:55 2026 UTC.