Items with Index Term: site staff
Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.
Al-Sasi, B O (2007) A lean approach to capacity management in construction. PhD thesis, University of Southampton, UK.
Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.
Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Enshassi, A; Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), pp. 61-72. ISSN 0969-9988
Gilmour, D; Simpson, E; Blackwood, D; McCallum, C and Logan, G (2016) Vocational training and knowledge development: A deeper understanding. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193
Kamardeen, I (2010) Knowledge-based occupational health and safety planning for construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lam, P T I and Wong, F W H (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(3), pp. 305-320. ISSN 1471-4175
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Martin, L and Root, D (2008) Empowerment in South Africa and the educational aspect of the basho. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.
Rowlinson, S; Ho, T K K and Po-Hung, Y (1993) Leadership style of construction managers in Hong Kong. Construction Management and Economics, 11(6), pp. 455-465. ISSN 01446193
Roy, R; Waller, J and Low, M (2002) Development of a process documentation system for the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451
Salami, B A; Ajayi, S O and Oyegoke, A S (2022) Coping with the covid-19 pandemic: An exploration of the strategies adopted by construction firms. Journal of Engineering, Design and Technology, 20(1), pp. 159-182. ISSN 1726-0531
Smithers, G L and Walker, D H T (2000) The effect of the workplace on motivation and demotivation of construction professionals. Construction Management and Economics, 18(7), pp. 833-841. ISSN 01446193
Stewart, M G (1993) Modeling human performance in reinforced concrete beam construction. Journal of Construction Engineering and Management, 119(1), pp. 6-22. ISSN 0733-9364
Up a level