Items with Index Term: dashboard

Number of items: 24.

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Bull, R and Janda, K B (2018) Beyond feedback: Introducing the 'engagement gap' in organizational energy management. Building Research & Information, 46(3), pp. 300-315. ISSN 0961-3218

Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Ezzeddine, A; Shehab, L; Srour, I; Power, W; Zankoul, E and Freiha, E (2023) Ccc_implementing the construction control room on a fast-paced project: The case study of the beirut port explosion. International Journal of Construction Management, 23(5), pp. 745-755. ISSN 1562-3599

Gurmu, A; Hosseini, M R; Arashpour, M and Lioeng, W (2025) Development of building defects dashboards and stochastic models for multi-storey buildings in Victoria, Australia. Construction Innovation, 25(2), pp. 594-619. ISSN 1471-4175

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364

Hernandezgaytan, V H (2022) The reemergence of a geotechnical, special inspection, and construction material testing firm. DEng thesis, Texas A&M University, USA.

Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. PhD thesis, Stanford University, USA.

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X

Negreiros, Iara (2018) Urban retrofitting an approach to support decision-making. PhD thesis, Universidade de São Paulo, Brazil.

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Ronzani, M (2019) Designing for complexity: Data visualizations in megaproject management. PhD thesis, University of Edinburgh, UK.

Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364

Shirowzhan, S; Sepasgozar, S M E and Trinder, J (2021) Developing metrics for quantifying buildings' 3D compactness and visualizing point cloud data on a web-based app and dashboard. Journal of Construction Engineering and Management, 147(3): 04020178, ISSN 0733-9364

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(2), pp. 102-120. ISSN 2204-9029

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

This list was generated on Sun Aug 23 02:46:46 2026 UTC.