Items with Index Term: decision criteria
Acheamfour, V K; Kissi, E; Adjei-Kumi, T and Adinyira, E (2020) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology, 18(1), pp. 70-83. ISSN 1726-0531
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Ali, S (2022) Identification of key factors that aid the decision on whether to refurbish-reuse or demolish-rebuild existing and newly designed buildings and highways. PhD thesis, London South Bank University, UK.
Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Arowosafe, O; Ceranic, B and Dean, A M (2015) A sustainable infrastructure delivery model: Value added strategy in the Nigerian construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bakht, M N and El-Diraby, T E (2015) Synthesis of decision-making research in construction. Journal of Construction Engineering and Management, 141(9): 4015027, ISSN 0733-9364
Chiang, Y H; Zhou, L; Li, J; Lam, P T I and Wong, K W (2014) Achieving sustainable building maintenance through optimizing life-cycle carbon, cost, and labor: Case in Hong Kong. Journal of Construction Engineering and Management, 140(3): 5014001, ISSN 0733-9364
De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364
El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Fazeli, A; Jalaei, F; Khanzadi, M and Banihashemi, S (2022) BIM-integrated TOPSIS-fuzzy framework to optimize selection of sustainable building components. International Journal of Construction Management, 22(7), pp. 1240-1259. ISSN 1562-3599
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Hosny, O; Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), pp. 381-405. ISSN 0969-9988
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Jafari, A (2018) A decision-making framework for the selection of sustainable alternatives for energy-retrofits. PhD thesis, University of New Mexico, USA.
Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.
Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. PhD thesis, Stanford University, USA.
Kishk, M; Laing, R and Pollock, R (2004) A novel approach for selecting finishes: System algorithm and methodology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Lam, K C; Hu, T; Ng, S T; Skitmore, M and Cheoung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(2), pp. 175-188. ISSN 01446193
Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364
Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193
Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X
Ng, S-t T (1996) Case-based reasoning decision support for contractor prequalification. PhD thesis, University of Manchester, UK.
Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029
Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364
Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988
Nieboer, N (2017) Improving energy performance of Dutch homes: Coping with general investment behaviours. International Journal of Building Pathology and Adaptation, 35(5), pp. 488-500.
Nikou, T and Klotz, L (2014) Application of multi-attribute utility theory for sustainable energy decisions in commercial buildings: A case study. Smart and Sustainable Built Environment, 3(3), pp. 207-222. ISSN 2046-6099
Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364
Owusu-Manu, D G; Holt, G D; Edwards, D J and Badu, E (2014) Determinants of trade credit supply among the Ghanaian construction sector. Built Environment Project and Asset Management, 4(4), pp. 368-383. ISSN 2044-124X
Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364
Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.
Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.
Radzi, A R; Rahman, R A; Doh, S I and Esa, M (2022) Construction readiness for highway projects: Key decision criteria. Journal of Construction Engineering and Management, 148(2): 04021196, ISSN 0733-9364
Rogers, M (1998) Systematic decision-making in the environmental assessment of civil engineering projects. PhD thesis, University College Dublin, Ireland.
Sackey, S and Kim, B S (2018) Environmental and economic performance of asphalt shingle and clay tile roofing sheets using life cycle assessment approach and TOPSIS. Journal of Construction Engineering and Management, 144(11): 04018104, ISSN 0733-9364
Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Sistos-Sescosse, G; Atuahene, B T; Ajulo, O and Adams, I (2025) Examining the decision criteria for BIM–LCA: A case study. Construction Economics and Building, 25(1), pp. 203-220. ISSN 2204-9029
Songer, A D and Ibbs, W C (1995) Managing requests for proposal development in public sector design-build. Journal of Construction Procurement, 1(1), pp. 64-80. ISSN 1358-9180
Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364
Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364
Thomas Ng, S; Skitmore, R M and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988
Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wah, L W (2015) Impact of organisational culture on Malaysian international contractors’ bidding decisions. PhD thesis, University of Malaya, Malaysia.
Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364
Zainab S, P W and Goodhew S, F A (2013) Stakeholders perspective on sustainable technology selection to achieve zero carbon retail buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193
Up a level