Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364

McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.

Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.