Items where Author is "Lucko, G"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 36.

Article

Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364

Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364

Huynh, H T; Lucko, G and Eid, M S (2023) Game theory approach for concurrent delay analysis. Journal of Construction Engineering and Management, 149(3): 04023002, ISSN 0733-9364

Gomes Araújo, L and Lucko, G (2022) Best practices for case studies in construction engineering and management research. Journal of Construction Engineering and Management, 148(8): 04022062, ISSN 0733-9364

González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364

Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364

Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364

Lucko, G and Kaminsky, J A (2016) Construction engineering conference and workshop 2014: Setting an industry-academic collaborative research agenda. Journal of Construction Engineering and Management, 142(4): 04015096, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599

Araújo, L G and Lucko, G (2016) Slip chart-inspired project schedule diagramming: Links, extension to network schedules, and unification. Journal of Construction Engineering and Management, 142(7): 4016011, ISSN 0733-9364

Lucko, G; Araújo, L G and Cates, G R (2016) Slip chart-inspired project schedule diagramming: Origins, buffers, and extension to linear schedules. Journal of Construction Engineering and Management, 142(5): 04015101, ISSN 0733-9364

Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. II: Feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X

Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364

Lucko, G and Mitchell, Z W (2010) Quantitative research: Preparation of incongruous economic data sets for archival data analysis. Journal of Construction Engineering and Management, 136(1), pp. 49-57. ISSN 0733-9364

Lucko, G and Rojas, E M (2010) Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127-135. ISSN 0733-9364

Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364

Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Shapira, A; Lucko, G and Schexnayder, C J (2007) Cranes for building construction projects. Journal of Construction Engineering and Management, 133(9), pp. 690-700. ISSN 0733-9364

Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364

Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364

Thesis

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

This list was generated on Sun Aug 23 01:24:03 2026 UTC.