Items where Author is "Pan, W"
Ping, T; Pan, W and Zhang, Z (2025) Developing a systematic performance measurement framework for benchmarking steel modular building construction. Engineering, Construction and Architectural Management, 32(3), pp. 1837-1856. ISSN 0969-9988
Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364
Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364
Hewa Welege, N M; Pan, W and Kumaraswamy, M (2024) Stakeholder collaboration to mitigate constraints to delivering low-carbon buildings: Insights from high-rise high-density cities. Engineering, Construction and Architectural Management, 31(11), pp. 4439-4461. ISSN 0969-9988
Yang, L; Li, Q and Pan, W (2024) A domain model for geometric modeling in support of the automated BIM modeling. Engineering, Construction and Architectural Management, 31(12), pp. 4897-4919. ISSN 0969-9988
Hewa Welege, N M; Pan, W and Kumaraswamy, M M (2023) Engaging stakeholders to overcome the common constraints for delivering low carbon buildings in high-rise high-density cities. Journal of Construction Engineering and Management, 149(1): 04022157, ISSN 0733-9364
Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218
Pan, W and Pan, M (2023) Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, 30(7), pp. 2669-2690. ISSN 0969-9988
Pan, M; Yang, Y; Zheng, Z and Pan, W (2022) Artificial intelligence and robotics for prefabricated and modular construction: A systematic literature review. Journal of Construction Engineering and Management, 148(9): 03122004, ISSN 0733-9364
Zhang, Z; Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), pp. 2615-2634. ISSN 0969-9988
Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364
Zhan, W; Pan, W and Hao, G (2022) Productivity measurement and improvement for public construction projects. Journal of Construction Engineering and Management, 148(6): 04022035, ISSN 0733-9364
Zhao, X and Pan, W (2022) The characteristics and evolution of business model for green buildings: A bibliometric approach. Engineering, Construction and Architectural Management, 29(10), pp. 4241-4266. ISSN 0969-9988
Yang, Y and Pan, W (2021) Automated guided vehicles in modular integrated construction: potentials and future directions. Construction Innovation, 21(1), pp. 85-104. ISSN 1471-4175
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Welege, N M H; Pan, W and Kumaraswamy, M M (2021) Constraints to delivering low carbon buildings in high-rise high-density cities. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Zhan, W; Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(4), pp. 863-885. ISSN 0969-9988
Pan, W; Chen, L and Zhan, W (2021) Positioning construction workers' vocational training of guangdong in the global political-economic spectrum of skill formation. Engineering, Construction and Architectural Management, 28(9), pp. 2489-2515. ISSN 0969-9988
Nandun Madhusanka Hewa, W; Pan, W and Kumaraswamy, M (2021) Social network analysis applications in sustainable construction and built environment management: A review. Built Environment Project and Asset Management, 11(4), pp. 511-528. ISSN 2044-124X
Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364
Shafiee, S; Piroozfar, P; Hvam, L; Farr, E R P; Huang, G Q; Pan, W; Kudsk, A; Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: A comparative analysis. Architectural Engineering and Design Management, 16(4), pp. 270-292. ISSN 1745-2007
Pan, M and Pan, W (2020) Understanding the determinants of construction robot adoption: Perspective of building contractors. Journal of Construction Engineering and Management, 146(5): 04020040, ISSN 0733-9364
Linner, T; Pan, W; Hu, R; Zhao, C; Iturralde, K; Taghavi, M; Trummer, J; Schlandt, M and Bock, T (2020) A technology management system for the development of single-task construction robots. Construction Innovation, 20(1), pp. 96-111. ISSN 1471-4175
Javed, A A; Pan, W; Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(3), pp. 239-252. ISSN 2044-124X
Zhao, X; Chen, L; Pan, W and Lu, Q (2017) AHP-ANP-fuzzy integral integrated network for evaluating performance of innovative business models for sustainable building. Journal of Construction Engineering and Management, 143(8): 04017054, ISSN 0733-9364
Zhao, X and Pan, W (2017) Co-productive interrelations between business model and zero-carbon building: A conceptual model. Built Environment Project and Asset Management, 7(4), pp. 353-365. ISSN 2044-124X
Chang, C Y; Pan, W and Howard, R (2017) Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis. Journal of Construction Engineering and Management, 143(8): 04017044, ISSN 0733-9364
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Pan, W and Ning, Y (2015) A socio-technical framework of zero-carbon building policies. Building Research & Information, 43(1), pp. 94-110. ISSN 0961-3218
Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Dangana, Z; Pan, W and Goodhew, S (2012) Delivering sustainable buildings in retail construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Heffernan, E; Pan, W and Liang, X (2012) Delivering zero carbon homes in the UK. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364
Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364
Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X
Pan, W and Arif, M (2011) Manufactured construction: Revisiting the construction-manufacturing relations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Burley, J and Pan, W (2010) Adoption of air source heat pumps for low carbon homes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Davis, L; Miles, M; Riley, M and Pan, W (2010) Developing lean supply in construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988
Pan, W and Gibb, A G F (2009) Maintenance performance evaluation of offsite and in situ bathrooms. Construction Innovation, 9(1), pp. 7-21. ISSN 1471-4175
Soetanto, R and Pan, W (2009) Strategic planning of UK housebuilders: Case study of a major property developer. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218
Pan, W; Gibb, A G F and Sellars, A B (2008) Maintenance cost implications of utilizing bathroom modules manufactured offsite. Construction Management and Economics, 26(10), pp. 1067-1077. ISSN 1466433X
Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.
Asad, S; Fuller, P; Pan, W and Dainty, A R J (2005) Learning to innovate in construction: A case study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Pan, W; Dainty, A R J and Gibb, A G F (2004) Managing innovation: A focus on off-site production (OSP) in the UK housebuilding industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Up a level