Items with Index Term: labour resource
Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Agapiou, A; Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: Understanding labour resource issues. Construction Management and Economics, 13(2), pp. 149-161. ISSN 01446193
Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.
Barakat, T A H (2009) A hybrid model of communication and information management in mega construction projects in Dubai using a new critical success factor approach. PhD thesis, Loughborough University, UK.
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387
Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599
Fini, A A F; Akbarnezhad, A; Rashidi, T H and Waller, S T (2018) Dynamic programming approach toward optimization of workforce planning decisions. Journal of Construction Engineering and Management, 144(2): 04017113, ISSN 0733-9364
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Hassanein, A and Melin, J (1997) Crew design methodology for construction contractors. Journal of Construction Engineering and Management, 123(3), pp. 203-207. ISSN 0733-9364
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Jang, W S and Skibniewski, M J (2009) Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management, 135(5), pp. 378-386. ISSN 0733-9364
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364
Ma, S; Li, Z; Li, L and Yuan, M (2023) Coupling coordination degree spatiotemporal characteristics and driving factors between new urbanization and construction industry: Evidence from China. Engineering, Construction and Architectural Management, 30(10), pp. 5280-5301. ISSN 0969-9988
Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X
Mathar, H; Assaf, S; Hassanain, M A; Abdallah, A and Sayed, A M Z (2020) Critical success factors for large building construction projects: Perception of consultants and contractors. Built Environment Project and Asset Management, 10(3), pp. 349-367. ISSN 2044-124X
Muya, M; Mulenga, M N; Bwalya, D C; Edum-Fotwe, F T and Price, A D F (2003) Construction skills requirement issues in Zambia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.
Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988
Saad, S; Alaloul, W S; Ammad, S and Qureshi, A H (2022) A qualitative conceptual framework to tackle skill shortages in offsite construction industry: A scientometric approach. Engineering, Construction and Architectural Management, 29(10), pp. 3917-3947. ISSN 0969-9988
Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.
Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.
Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364
Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531