Items with Index Term: product development

Number of items: 67.

Afeez, A and Kumar, A (2013) Application of CAD and reverse engineering methodology for development of complex assemblies. Journal of Engineering, Design and Technology, 11(3), pp. 375-390. ISSN 1726-0531

Ali, F; Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(2), pp. 178-189. ISSN 1726-0531

Anderson, P M (2006) Construction collaboration: a QFD approach. PhD thesis, Loughborough University, UK.

Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.

Ball, Z; Cagan, J and Kotovsky, K (2024) Supporting management of new product development via a novel conceptual model: An interview driven approach. Journal of Engineering, Design and Technology, 22(3), pp. 991-1011. ISSN 1726-0531

Bello, A O; Isa, R B; Oke, A E; Arogundade, S and Lewis, J M O (2026) Circular economy implementation in the construction industry: An examination of the barriers in a developing country. International Journal of Building Pathology and Adaptation, 44(1), pp. 143-162. ISSN 2398-4708

Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.

Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement. PhD thesis, University of Gloucestershire, UK.

Camargo Júnior, Alceu Salles (2003) Simultaneous engineering: A comparison between "point-based" and "set-based" approaches. PhD thesis, Universidade de São Paulo, Brazil.

Chowdary, B V and Jaglal, D (2023) 3D CAD model reconstruction and fast prototyping of rotational parts: A reverse engineering approach. Journal of Engineering, Design and Technology, 21(5), pp. 1520-1544. ISSN 1726-0531

Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.

Edouard, M B; Camille, J; Vincent, B and Améziane, A (2025) Design for mixed model final assembly line (dfmmfal): A new tool for assembly interface identification based on assembly process planning. Journal of Engineering, Design and Technology, 23(1), pp. 143-160. ISSN 1726-0531

Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.

Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499

Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988

Friedrich, D (2022) Consumer and expert behaviour towards biobased wood-polymer building products: A comparative multi-factorial study according to theory of planned behaviour. Architectural Engineering and Design Management, 18(1), pp. 73-92. ISSN 1745-2007

Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5), pp. 437-450. ISSN 01446193

Georgiou, A; Haritos, G; Fowler, M and Imani, Y (2016) Advanced phase powertrain design attribute and technology value mapping. Journal of Engineering, Design and Technology, 14(1), pp. 115-133.

Gijsbers, R and Lichtenberg, J (2014) Demand driven selection of adaptable building technologies for flexibility-in-use. Smart and Sustainable Built Environment, 3(3), pp. 237-260. ISSN 2046-6099

Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.

Gudem, M; Steinert, M; Welo, T and Leifer, L (2013) Redefining customer value in lean product development design projects. Journal of Engineering, Design and Technology, 11(1), pp. 71-89. ISSN 1726-0531

Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.

Harryson, P (2008) Industrial bridge engineering: structural developments for more efficient bridge construction. PhD thesis, Chalmers University of Technology, Sweden.

Jain, N R; Rawal, R; Vardhan, V and Dey, S (2021) Performance metrics for room air-conditioners: Energy, comfort and environmental impacts. Buildings & Cities, 2(1), pp. 666-687. ISSN 2632-6655

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Koch, C and Simonsen, R (2002) Seeping in? Embankment of product innovations in urban renewal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kono, J (2018) Improving the sustainability performance of building materials: An approach from life cycle thinking. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Koukkari, H (2010) Transformation of a research centre toward an innovation partner in the construction sector. Engineering, Construction and Architectural Management, 17(1), pp. 89-98. ISSN 0969-9988

Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(5-6), pp. 325-334. ISSN 0969-9988

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193

Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(2), pp. 156-178. ISSN 1471-4175

Lostuvali, B; Alves, T C L and Modrich, R U (2014) Learning from the cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), pp. 160-180. ISSN 1557-8771

Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.

Matipa, W M (2008) Total cost management at the design stage using a building product model. PhD thesis, University College Cork, Ireland.

McLarnon, C; Spillane, J P; Bradley, J; McCartan, N and Nelson, M (2020) Open innovation within loughview timber: How knowledge transfer is opening doors to new markets. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.

Nuesse, G (2013) Development of an integrated management model for effective applications of cooperative construction research. PhD thesis, Kingston University, UK.

Palsodkar, M A; Pansare, R; Nagare, M R and Narwane, V (2025) Repurposing product development after COVID-19 by integrating industry 4.0 and agile new product development practices in emerging economies. Journal of Engineering, Design and Technology, 23(5), pp. 1592-1618. ISSN 1726-0531

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Roy, R and Cochrane, S P (1999) Development of a customer focused strategy in speculative house building. Construction Management and Economics, 17(6), pp. 777-787. ISSN 01446193

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Sanderford, A R; McCoy, A P and Keefe, M J (2018) Adoption of energy star certifications: Theory and evidence compared. Building Research & Information, 46(2), pp. 207-13. ISSN 0961-3218

Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.

Sekar, G; Sambasivan, M and Viswanathan, K (2021) Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), pp. 174-194. ISSN 2044-124X

Teizer, J; Venugopal, M; Teizer, W and Felkl, J (2012) Nanotechnology and its impact on construction: Bridging the gap between researchers and industry professionals. Journal of Construction Engineering and Management, 138(5), pp. 594-604. ISSN 0733-9364

Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.

Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.

Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364

Uniacke, H (2001) Design of a low cost ventilated photovoltaic cladding. PhD thesis, Cardiff University, UK.

Vinodh, S; Selvaraj, T and Praveen, T (2012) Design and development of agile product development cycle for rotary switches. Journal of Engineering, Design and Technology, 10(3), pp. 380-396. ISSN 1726-0531

Wu, M; Wang, L; Li, M and Long, H (2015) Alleviating feature fatigue in product development based on the bass model. Journal of Engineering, Design and Technology, 13(3), pp. 350-368.

Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599

Yuan, Y; Zhou, X and Zhang, X (2019) Numerical and experimental study on the characteristics of radiant ceiling systems. Building Research & Information, 47(8), pp. 912-927. ISSN 0961-3218

Zika-Viktorsson, A (2002) The industrial project. Studies of the work situation of project members. PhD thesis, KTH Royal Institute of Technology, Sweden.

de Ridder, H and Vrijhoef, R (2008) Developing a strategy for 'living buildings': Beyond cradle to cradle with living building concept. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

This list was generated on Sun Aug 23 02:50:26 2026 UTC.