Items with Index Term: regression modelling
Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007
Abediniangerabi, B; Shahandashti, S M; Ahmadi, N and Ashuri, B (2017) Empirical investigation of temporal association between architecture billings index and construction spending using time-series methods. Journal of Construction Engineering and Management, 143(10): 04017080, ISSN 0733-9364
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(3), pp. 269-285. ISSN 1366-4387
Amarkhil, Q and Elwakil, E (2022) Construction organization success strategy in post-conflict environment. International Journal of Construction Management, 22(4), pp. 701-710. ISSN 1562-3599
Bowen, P A; Govender, R; Edwards, P J and Cattell, K (2014) An integrated model of HIV/AIDS testing behaviour in the construction industry. Construction Management and Economics, 32(11), pp. 1106-1129. ISSN 01446193
Chan, I Y S and Liu, A M M (2012) Antecedents of innovation climate in construction firms in Hong Kong. International Journal of Construction Management, 12(4), pp. 37-46. ISSN 1562-3599
Chan I Y S, L A M M and Cao S, F R (2013) Competency and empowerment of project managers in China. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Das, D K (2022) Exploring the factors and measures to improve safety in road construction in India. Journal of Construction in Developing Countries, 27(1), pp. 139-152. ISSN 1823-6499
Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364
Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029
Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X
Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Jirsaraei, M. J.; Lee, S.; DeStefano, S.; Gerber, L. H.; Ji, W. and Sikdar, S. (2026) Multidomain analysis of chronic pain intensity in labor-intensive occupations: Insights from network and regression modeling. Journal of Construction Engineering and Management, 152(8): 04026110, ISSN 0733-9364
Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387
Lansley, P (2013) Research assessment and the activity hypothesis. Engineering, Construction and Architectural Management, 20(1), pp. 7-28. ISSN 0969-9988
Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.
Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364
Li, H X; Nair, S; Li, Y; Yahaya, A; Timms, W and Owolabi, A B (2026) Evaluating energy performance of educational buildings: A case study in Australia. Engineering, Construction and Architectural Management, 33(15), pp. 137-158. ISSN 0969-9988
Miller, L; Mannering, F and Abraham, D M (2009) Effectiveness of speed control measures on nighttime construction and maintenance projects. Journal of Construction Engineering and Management, 135(7), pp. 614-619. ISSN 0733-9364
Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387
Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499
Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(2), pp. 180-196. ISSN 0969-9988
Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193
Schmidt, J R (1997) Quantifying the impact of construction accidents using predictive models. PhD thesis, State University of New York at Buffalo, USA.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.
Yang, H; Li, H; Wang, G and Cao, D (2025) Interregional migration of construction workers in China: Roles of employment opportunities and environment amenities. Engineering, Construction and Architectural Management, 32(1), pp. 87-108. ISSN 0969-9988
Zhao, N; Liu, Q; Li, H; Siamuzwe-Manase, V and Skitmore, M (2026) How does mindful leadership affect individual innovative behavior in megaprojects?–a cross-level study. International Journal of Construction Management, 26(2), pp. 349-364. ISSN 1562-3599
Up a level