Items with Index Term: intuition

Number of items: 91.

Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) Risk identification practices under PFI environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Al-Fadhala, M M (2002) Uncertainty-based condition assessment of existing concrete structures. PhD thesis, University of Maryland, College Park, USA.

Al-Harasis, D H; Jabi, W and Sharmin, T (2025) Developing a taxonomy for sensory-informed architectural design qualities in autism. Building Research & Information, 53(4), pp. 532-551. ISSN 0961-3218

Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599

Amoah, A; Berbegal-Mirabent, J and Marimon, F (2021) Making the management of a project successful: Case of construction projects in developing countries. Journal of Construction Engineering and Management, 147(12): 04021166, ISSN 0733-9364

Antoniou, F and Aretoulis, G (2019) A multi-criteria decision-making support system for choice of method of compensation for highway construction contractors in Greece. International Journal of Construction Management, 19(6), pp. 492-508. ISSN 1562-3599

Arthur, A C and Pryke, S D (2014) Are we adding risk to our projects by mixing objective assessments of compound conjunctive and disjunctive project risks with intuitive approaches? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Bohm, M (2025) Building performance simulation for sensemaking in architectural pedagogy. Buildings & Cities, 6(1), pp. 450-465. ISSN 2632-6655

Boyd, D (2013) Using events to connect thinking and doing in knowledge management. Construction Management and Economics, 31(11), pp. 1144-1159. ISSN 1466433X

Burl, David Graham (2010) Do joint ventures out perform sole ventures in business and financial terms: The case of the construction and property development sectors. PhD thesis, University of the West of Scotland, UK.

Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218

Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chan, P W (2016) Expert knowledge in the making: Using a processual lens to examine expertise in construction. Construction Management and Economics, 34(7-8), pp. 471-483. ISSN 01446193

Chua, D K H; Li, D Z and Chan, W T (2001) Case-based reasoning approach in bid decision making. Journal of Construction Engineering and Management, 127(1), pp. 35-45. ISSN 0733-9364

Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.

Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531

Egbu, C O; Botterill, K and Bates, M (2001) The influence of knowledge management and intellectual capital on organizational innovations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Gasparin, M (2014) Management of design as a translation process. PhD thesis, University of Leicester, UK.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Govan, P B (2014) Causal network methods for integrated project portfolio risk analysis. PhD thesis, Texas A&M University, USA.

Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.

Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach. PhD thesis, University of Colorado at Boulder, USA.

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Juan, Y K; Lin, I C and Tsai, J X (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(3), pp. 515-534. ISSN 0969-9988

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.

Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.

Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lu, H; Qi, J; Li, J; Xie, Y; Xu, G and Wang, H (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management, 27(8), pp. 1963-1991. ISSN 0969-9988

Ma, L; Guo, H and Fang, Y (2021) Analysis of construction workers' safety behavior based on Myers-Briggs type indicator personality test in a bridge construction project. Journal of Construction Engineering and Management, 147(1): 04020149, ISSN 0733-9364

Mahdjoubi, L (2001) An investigation of computer-generated architectural representations on design decision-tasks. PhD thesis, University of Newcastle upon Tyne, UK.

Mak, M Y and Ng, S T (2008) Feng shui: An alternative framework for complexity in design. Architectural Engineering and Design Management, 4(1), pp. 58-72. ISSN 1745-2007

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Messner, J I (1994) An information framework for evaluating international construction projects. PhD thesis, Pennsylvania State University, USA.

Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.

Millet, A; Abi Akle, A and Legardeur, J (2024) Assessing users-designers’ gap of perception to help design for a hybrid product domain: application to sport-health product domain. Journal of Engineering, Design and Technology, 22(6), pp. 1999-2019. ISSN 1726-0531

Mochtar, K (2000) Market-based pricing in construction. PhD thesis, Illinois Institute of Technology, USA.

Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(4), pp. 405-415. ISSN 01446193

Moorhead, Matthew (2019) Feasibility analysis in the pre-commitment stages of the property development process: An examination of uncertainty, risk and heuristic bias in management decision making Processes During the Pre‐commitment Stages of the Property Development Process in Australia. PhD thesis, Bond University, Australia.

Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nnamani, O. C. and Ogbue, J. U. (2026) Assessing risk analysis and management practices of property development companies in Nigeria. Construction Economics and Building, 26(2): 380, ISSN 2204-9029

Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Olbina, S; Grosskopf, K; Johns, T and Scicchitano, M (2008) Perceptions of scholarly standards in technical publication. International Journal of Construction Education and Research, 4(3), pp. 210-226. ISSN 1557-8771

Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387

Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.

Schmidt Iii, R; Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(1-2), pp. 160-182. ISSN 01446193

Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.

Seboni, L and Tutesigensi, A (2015) A mathematical model for allocating project managers to projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Solovyova, I (2008) The role of the autobiographical experiences with emotional significance of an architect in design conjecturing. PhD thesis, Texas A&M University, USA.

Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.

Tan, Y; Smith, N J and Bower, D A (2003) Improving risk identification by utilizing hybrid intelligent reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tonetto, L M; Brust-Renck, P G; Ruecker, S; Fogliatto, F S and Pacheco, D A D J (2021) Differences in thinking styles across professionals with different academic backgrounds when developing a product. Architectural Engineering and Design Management, 17(1-2), pp. 3-16. ISSN 1745-2007

Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029

Veerasanai, R and Alias, A (2022) A review of foreign construction firm presence in the Malaysian construction industry. International Journal of Construction Management, 22(10), pp. 1830-1843. ISSN 1562-3599

Volker, L (2010) Deciding about design quality: value judgements and decision making in the selection of architects by public clients under European tendering regulations. PhD thesis, Delft University of Technology, Netherlands.

Walker, D H T; Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(6), pp. 645-658. ISSN 1466433X

Wanous, M; Boussabaine, A H and Lewis, J (1999) A qualitative bidding model. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Wong, F W H; Lam, P T I and Shen, L Y (2004) A dynamic design management system for improving buildability of construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193

Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364

Zailani, B M; Ibrahim, Y M; Abdullahi, M; Dania, A and Abubakar, M (2023) Constructing the team: A personality-based perspective to team absorptive capacity. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988

Zekri, A.; Tarkashvand, A. and Ekhlassi, A. (2026) An integrated rational-intuitive knowledge-based decision-making model for facade aesthetics using smart method. Architectural Engineering and Design Management, 22(1), pp. 39-66. ISSN 1745-2007

ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

This list was generated on Sun Aug 23 02:21:58 2026 UTC.